{"id":5366,"date":"2026-08-12T07:23:50","date_gmt":"2026-08-12T07:23:50","guid":{"rendered":"https:\/\/ceshi.baoxuanmetal.com\/?p=5366"},"modified":"2026-08-15T09:20:28","modified_gmt":"2026-08-15T09:20:28","slug":"quote-validity-custom-parts","status":"publish","type":"post","link":"https:\/\/ceshi.baoxuanmetal.com\/quote-validity-custom-parts\/","title":{"rendered":"Quote Validity for Custom Parts: How Long It Lasts and What Happens After Expiration"},"content":{"rendered":"<p class=\"isSelectedEnd\">When you request a quote for custom sheet metal parts, CNC machined components, or fabricated assemblies, <strong>the price you receive does not stay on the table forever.<\/strong> Every manufacturer attaches a time limit to their offer \u2014 a window during which <strong>the quoted price, lead time, and terms remain guaranteed.<\/strong> That window is the <strong>quote validity period.<\/strong><\/p>\n<p class=\"isSelectedEnd\">Understanding what quote validity means, how long it typically lasts, and what happens when it expires can help you <strong>plan procurement timelines more effectively and avoid unexpected cost changes.<\/strong><\/p>\n<h2>What Is Quote Validity?<\/h2>\n<p class=\"isSelectedEnd\">Quote validity is the period during which a manufacturer commits to honor the pricing, lead time, and terms stated in a <a href=\"https:\/\/ceshi.baoxuanmetal.com\/manufacturing-quotation-guide\/\"><strong data-start=\"556\" data-end=\"583\">manufacturing quotation<\/strong><\/a>. Once that period passes, the manufacturer is no longer obligated to hold the original price \u2014 material costs, production capacity, and processing fees may have shifted.<\/p>\n<p class=\"isSelectedEnd\">In custom manufacturing, a quote is not a fixed catalog price. It is calculated from part geometry, the <a href=\"https:\/\/ceshi.baoxuanmetal.com\/sheet-metal-material-specifications\/\"><strong data-start=\"5299\" data-end=\"5337\">sheet metal material specification<\/strong><\/a>, tolerances, order quantity, and required manufacturing processes.<\/p>\n<div id=\"attachment_5373\" style=\"width: 610px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-5373\" class=\"wp-image-5373 size-fusion-600\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-600x338.webp\" alt=\" A timeline diagram showing a manufacturing quote being issued, a validity window, and the expiration point\" width=\"600\" height=\"338\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-is-quote-validity-concept.webp 1672w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><p id=\"caption-attachment-5373\" class=\"wp-caption-text\"><span style=\"color: #808080;\">A simple timeline illustrating the lifecycle of a manufacturing quote \u2014 from issuance through the validity period to expiration \u2014 showing when pricing and terms are guaranteed.<\/span><\/p><\/div>\n<p>Because these variables interact with market conditions and shop-floor scheduling, manufacturers cannot lock in pricing indefinitely. <strong>The validity period defines how long they are willing to absorb those variables at the quoted rate.<\/strong><\/p>\n<h2>Why Manufacturers Set Expiration Dates on Quotes<\/h2>\n<p class=\"isSelectedEnd\">A quote expiration is not a sales tactic. It reflects real operational constraints on the manufacturing side. <strong>Three factors drive most validity decisions.<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>Raw material price volatility.<\/strong> Metals like aluminum, stainless steel, and cold-rolled steel are priced against commodity indexes \u2014 LME for aluminum, COMEX for steel. Prices can swing 5\u201315% within a few weeks, especially during supply chain disruptions.<\/p>\n<div id=\"attachment_5372\" style=\"width: 610px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-5372\" class=\"wp-image-5372 size-fusion-600\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-600x338.webp\" alt=\"A commodity price fluctuation chart for aluminum and steel over 90 days with marked quote validity windows\" width=\"600\" height=\"338\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/raw-material-price-volatility.webp 1672w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><p id=\"caption-attachment-5372\" class=\"wp-caption-text\"><span style=\"color: #808080;\">A line chart showing how aluminum and steel commodity prices fluctuate over a 90-day period, demonstrating why manufacturers limit quote validity to short windows.<\/span><\/p><\/div>\n<p class=\"isSelectedEnd\">A manufacturer quoting today at a certain material cost cannot guarantee that cost will hold 60 or 90 days out. <strong>Shorter validity periods protect both the buyer and the supplier from pricing misalignment.<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>Production capacity and scheduling.<\/strong> A fabrication shop runs on finite machine hours and labor availability. When a manufacturer quotes a job, they are reserving a rough slot in their production schedule.<\/p>\n<p class=\"isSelectedEnd\">If a quote sits unapproved for months, that capacity may no longer be available at the originally estimated lead time. <strong>The validity period helps manufacturers plan their shop floor realistically.<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>Process and finishing cost changes.<\/strong> Secondary operations \u2014 powder coating, anodizing, plating, hardware insertion \u2014 involve third-party vendors or consumables whose pricing can change.<\/p>\n<p>Surface treatment costs, in particular, are sensitive to chemical prices and energy costs. <strong>A manufacturer who subcontracts finishing work cannot guarantee those costs beyond a limited window.<\/strong><\/p>\n<h2>Typical Quote Validity Periods in Custom Manufacturing<\/h2>\n<p class=\"isSelectedEnd\"><strong>Most custom manufacturing quotes fall within a 14- to 30-day validity window<\/strong>, though the exact period depends on the type of work and market conditions.<\/p>\n<p>The table below shows typical ranges for common scenarios:<\/p>\n<\/p>\n<div class=\"table-2\">\n<table width=\"100%\">\n<thead>\n<tr>\n<th align=\"left\">Validity Period<\/th>\n<th align=\"left\">Typical Use Case<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td align=\"left\"><strong>7\u201314 days<\/strong><\/td>\n<td align=\"left\">Volatile material costs (raw steel, copper), high-mix low-volume orders, construction or hardware components<\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><strong>14\u201330 days<\/strong><\/td>\n<td align=\"left\">Standard sheet metal fabrication, moderate complexity, stable material markets<\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><strong>30\u201360 days<\/strong><\/td>\n<td align=\"left\">Capital equipment, large assemblies, projects with long approval cycles<\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><strong>60+ days<\/strong><\/td>\n<td align=\"left\">Long-term contracts with price-adjustment clauses, blanket purchase orders<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\n<p class=\"isSelectedEnd\">For <a href=\"https:\/\/ceshi.baoxuanmetal.com\/custom-sheet-metal-fabrication-for-global-oems\/\"><strong data-start=\"1066\" data-end=\"1100\">custom sheet metal fabrication<\/strong><\/a>, a quote validity period of <strong data-start=\"1129\" data-end=\"1171\">14 to 30 days is the most common range<\/strong> under relatively stable material and production conditions.<\/p>\n<p>If you need a longer window, many manufacturers will negotiate an extension \u2014 but it may come with conditions such as a material cost adjustment clause or a minimum order commitment.<\/p>\n<h2>What Affects the Length of a Quote Validity Period?<\/h2>\n<p class=\"isSelectedEnd\">Not all quotes expire on the same schedule. Several variables influence how long a manufacturer is willing to hold a price.<\/p>\n<div id=\"attachment_5369\" style=\"width: 610px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-5369\" class=\"wp-image-5369 size-fusion-600\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-600x338.webp\" alt=\"An infographic showing four key factors that influence manufacturing quote validity period length\" width=\"600\" height=\"338\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/factors-affecting-quote-validity.webp 1672w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><p id=\"caption-attachment-5369\" class=\"wp-caption-text\"><span style=\"color: #808080;\">Four key variables \u2014 material type, part complexity, order quantity, and surface finish \u2014 shown as interconnected factors that determine how long a quote remains valid.<\/span><\/p><\/div>\n<p class=\"isSelectedEnd\"><strong>Material type and market conditions.<\/strong> Standard-grade aluminum (5052, 6061) and common stainless steel (304, 316) typically carry longer validity periods because supply is relatively stable.<\/p>\n<p class=\"isSelectedEnd\">Specialty alloys, copper, or materials subject to tariffs may carry shorter windows due to higher price volatility.<\/p>\n<p class=\"isSelectedEnd\"><strong>Part complexity and tolerances.<\/strong> Parts requiring tight tolerances (\u00b10.005&#8243; or tighter), complex forming, or multi-step fabrication involve more process planning.<\/p>\n<p class=\"isSelectedEnd\">If the manufacturer needs to reserve specific tooling or schedule dedicated machine time, they may offer a shorter validity to keep their planning flexible.<\/p>\n<p class=\"isSelectedEnd\"><strong>Order quantity and tooling requirements.<\/strong> Low-volume orders (under 100 pieces) typically have simpler pricing structures and may carry standard validity periods.<\/p>\n<p class=\"isSelectedEnd\">High-volume orders involving custom tooling, stamping dies, or dedicated fixtures often have longer validity periods because tooling costs are amortized over the production run \u2014 but <strong>the tooling itself may need to be ordered within a specific window.<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>Surface finish and secondary operations.<\/strong> Parts requiring powder coating, anodizing, silkscreening, or assembly involve coordination with finishing vendors.<\/p>\n<p>If those vendors adjust their pricing, the original quote may no longer cover the full cost. Quotes with extensive secondary operations sometimes carry shorter validity or include a separate finishing cost review clause.<\/p>\n<h2>What Happens When a Quote Expires?<\/h2>\n<p class=\"isSelectedEnd\"><strong>An expired quote does not mean the order is canceled or the manufacturer has declined the work.<\/strong> It simply means the original pricing and lead time are no longer guaranteed.<\/p>\n<div id=\"attachment_5371\" style=\"width: 610px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-5371\" class=\"wp-image-5371 size-fusion-600\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-600x750.webp\" alt=\"A decision flowchart showing the process after a manufacturing quote expires\" width=\"600\" height=\"750\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-200x250.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-240x300.webp 240w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-400x500.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-500x625.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-600x750.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-700x875.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-768x960.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-800x1000.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires-819x1024.webp 819w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/what-happens-after-quote-expires.webp 1122w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><p id=\"caption-attachment-5371\" class=\"wp-caption-text\"><span style=\"color: #808080;\">A flowchart outlining what happens when a quote expires \u2014 covering price changes, lead time shifts, and the re-quoting process.<\/span><\/p><\/div>\n<p class=\"isSelectedEnd\">Here is what typically happens:<\/p>\n<p class=\"isSelectedEnd\"><strong>The price may change.<\/strong> If material costs have risen since the original quote, the manufacturer will likely adjust the unit price. In some cases, the price may decrease \u2014 but buyers should not assume this.<\/p>\n<p class=\"isSelectedEnd\"><strong>Requesting a re-quote is the safest approach.<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>Lead time may shift.<\/strong> Production capacity that was available when the quote was issued may no longer be open.<\/p>\n<p class=\"isSelectedEnd\">A job that originally quoted a 2-week lead time might now require 3\u20134 weeks if the shop has since booked other orders.<\/p>\n<p class=\"isSelectedEnd\"><strong>A re-quote may require updated information.<\/strong> If your design has changed \u2014 even minor revisions to hole positions, bend radii, or surface callouts \u2014 the manufacturer may need to re-evaluate the part.<\/p>\n<p class=\"isSelectedEnd\"><strong>Sending the original drawing with a clear revision history speeds up the re-quoting process.<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>Can you still accept an expired quote?<\/strong> In some cases, manufacturers will honor an expired quote if the time gap is short (a few days) and material costs have not moved significantly.<\/p>\n<p>However, this is a courtesy, not a guarantee. <strong>The safest approach is to confirm pricing before placing an order on an expired quote.<\/strong><\/p>\n<h2>How to Make the Most of a Quote\u2019s Validity Period<\/h2>\n<p class=\"isSelectedEnd\">A few practical steps can help you move through the approval process before a quote expires:<\/p>\n<div id=\"attachment_5370\" style=\"width: 610px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-5370\" class=\"wp-image-5370 size-fusion-600\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-600x338.webp\" alt=\"A checklist-style graphic with four practical tips to make the most of a quote validity period\" width=\"600\" height=\"338\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/08\/tips-to-maximize-quote-validity.webp 1672w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><p id=\"caption-attachment-5370\" class=\"wp-caption-text\"><span style=\"color: #808080;\">Four actionable procurement tips \u2014 submit complete drawings, know your approval timeline, communicate changes early, and consider blanket orders \u2014 presented as a quick-reference checklist.<\/span><\/p><\/div>\n<ul data-spread=\"true\">\n<li><strong data-start=\"2874\" data-end=\"2935\">Submit a <a href=\"https:\/\/ceshi.baoxuanmetal.com\/sheet-metal-fabrication-drawings-rfq-checklist\/\">complete sheet metal RFQ<\/a> package from the start.<\/strong> Incomplete or ambiguous drawings often trigger <a href=\"https:\/\/ceshi.baoxuanmetal.com\/technical-clarification-manufacturing\/\"><strong data-start=\"5911\" data-end=\"5938\">technical clarification<\/strong><\/a>, and that back-and-forth can consume a significant portion of the quote validity window. Include material callouts, tolerances, surface finish requirements, and quantities on the first submission.<\/li>\n<li><strong>Know your internal approval timeline.<\/strong> If your procurement process typically takes 3 weeks, request a validity period that covers that cycle \u2014 or ask the manufacturer about extension options upfront.<\/li>\n<li><strong>Communicate design changes immediately.<\/strong> If you anticipate a drawing revision, let the manufacturer know before the validity period ends. A minor change to a bend angle or hole diameter can affect pricing and manufacturability.<\/li>\n<li><strong>Ask about blanket order pricing.<\/strong> For recurring parts, a blanket purchase order with agreed-upon pricing over a longer period (e.g., 6\u201312 months) can eliminate the need to re-quote each batch.<\/li>\n<\/ul>\n<h2>FAQs<\/h2>\n<div class=\"accordian fusion-accordian\" style=\"--awb-border-size:1px;--awb-icon-size:16px;--awb-content-font-size:var(--awb-typography4-font-size);--awb-icon-alignment:left;--awb-hover-color:var(--awb-color2);--awb-border-color:var(--awb-color3);--awb-background-color:var(--awb-color1);--awb-divider-color:var(--awb-color3);--awb-divider-hover-color:var(--awb-color3);--awb-icon-color:var(--awb-color1);--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);--awb-icon-box-color:var(--awb-color8);--awb-toggle-hover-accent-color:var(--awb-color5);--awb-title-font-family:var(--awb-typography1-font-family);--awb-title-font-weight:var(--awb-typography1-font-weight);--awb-title-font-style:var(--awb-typography1-font-style);--awb-title-font-size:16px;--awb-title-letter-spacing:var(--awb-typography1-letter-spacing);--awb-title-line-height:var(--awb-typography1-line-height);--awb-content-font-family:var(--awb-typography4-font-family);--awb-content-font-weight:var(--awb-typography4-font-weight);--awb-content-font-style:var(--awb-typography4-font-style);\"><div class=\"panel-group fusion-toggle-icon-boxed\" id=\"accordion-5366-1\"><div class=\"fusion-panel panel-default panel-0d024b616d052241c fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_0d024b616d052241c\"><a aria-expanded=\"false\" aria-controls=\"0d024b616d052241c\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-5366-1\" data-target=\"#0d024b616d052241c\" href=\"#0d024b616d052241c\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">Does quote validity start from the date the quote is sent or received?<\/span><\/a><\/h4><\/div><div id=\"0d024b616d052241c\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_0d024b616d052241c\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p class=\"isSelectedEnd\">Typically, <strong>validity starts from the date the quote is issued (sent), not the date you receive or open it.<\/strong><\/p>\n<p>Check the quote document \u2014 most manufacturers include a \u201cvalid until\u201d date clearly stated in the header or footer.<\/p>\n<p><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-b29f0b7c8d9f1f456 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_b29f0b7c8d9f1f456\"><a aria-expanded=\"false\" aria-controls=\"b29f0b7c8d9f1f456\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-5366-1\" data-target=\"#b29f0b7c8d9f1f456\" href=\"#b29f0b7c8d9f1f456\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">Can I request a longer validity period?<\/span><\/a><\/h4><\/div><div id=\"b29f0b7c8d9f1f456\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_b29f0b7c8d9f1f456\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p class=\"isSelectedEnd\">Yes. Many manufacturers will extend validity for <strong>7\u201315 additional days upon request<\/strong>, especially for repeat customers.<\/p>\n<p>Longer extensions may include a material cost adjustment clause, allowing the manufacturer to adjust pricing if commodity prices move beyond a specified threshold.<\/p>\n<p><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-513409bf893ccb06c fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_513409bf893ccb06c\"><a aria-expanded=\"false\" aria-controls=\"513409bf893ccb06c\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-5366-1\" data-target=\"#513409bf893ccb06c\" href=\"#513409bf893ccb06c\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">If I change the drawing after receiving a quote, is the original quote still valid?<\/span><\/a><\/h4><\/div><div id=\"513409bf893ccb06c\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_513409bf893ccb06c\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p class=\"isSelectedEnd\"><strong>In most cases, no.<\/strong> Drawing changes \u2014 even minor ones \u2014 can affect material usage, processing steps, and tooling requirements.<\/p>\n<p>Manufacturers typically treat a revised drawing as a new quoting request. <strong>Submitting a clear revision history helps the manufacturer re-quote quickly.<\/strong><\/p>\n<p><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-734f9497535ff6afa fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_734f9497535ff6afa\"><a aria-expanded=\"false\" aria-controls=\"734f9497535ff6afa\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-5366-1\" data-target=\"#734f9497535ff6afa\" href=\"#734f9497535ff6afa\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">What is the difference between quote validity and lead time?<\/span><\/a><\/h4><\/div><div id=\"734f9497535ff6afa\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_734f9497535ff6afa\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p class=\"isSelectedEnd\"><strong>Quote validity is how long the price and terms are guaranteed. Lead time is how long production and delivery take once the order is confirmed.<\/strong><\/p>\n<p>A quote may have 30-day validity but a 3-week lead time \u2014 these are independent timelines.<\/p>\n<p><\/div><\/div><\/div><\/div><\/div>\n<p>If you have a project in the quoting stage and want to understand how pricing, lead time, and validity apply to your specific parts, <a href=\"https:\/\/ceshi.baoxuanmetal.com\/contact-us\/\">contact our engineering team<\/a> for a detailed review.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>When you request a quote for custom sheet metal parts,  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":5368,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[126],"tags":[],"class_list":["post-5366","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-quoting-and-procurement-terms"],"acf":[],"_links":{"self":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/posts\/5366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/comments?post=5366"}],"version-history":[{"count":4,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/posts\/5366\/revisions"}],"predecessor-version":[{"id":5746,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/posts\/5366\/revisions\/5746"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/media\/5368"}],"wp:attachment":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/media?parent=5366"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/categories?post=5366"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/tags?post=5366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}