{"id":4573,"date":"2026-07-17T01:33:10","date_gmt":"2026-07-17T01:33:10","guid":{"rendered":"https:\/\/ceshi.baoxuanmetal.com\/?p=4573"},"modified":"2026-08-01T02:13:40","modified_gmt":"2026-08-01T02:13:40","slug":"sheet-metal-parts-pre-shipment-inspection","status":"publish","type":"post","link":"https:\/\/ceshi.baoxuanmetal.com\/de\/sheet-metal-parts-pre-shipment-inspection\/","title":{"rendered":"Pre-Shipment Inspection for Sheet Metal Parts: What We Check Before Shipping"},"content":{"rendered":"<p class=\"isSelectedEnd\">Pre-shipment inspection is the final quality-control step performed before sheet metal parts are packed and shipped. For customers, it determines whether the delivered parts match the drawings.<\/p>\n<p class=\"isSelectedEnd\">This guide explains the <strong>pre-shipment inspection process<\/strong> and how it helps ensure that parts are properly verified before leaving the factory.<\/p>\n<h2>What Pre-Shipment Inspection Covers and Why It Matters<\/h2>\n<p class=\"isSelectedEnd\">Pre-shipment inspection is the final stage of a layered quality-control system that includes:<\/p>\n<ul data-spread=\"false\">\n<li>Incoming Quality Control (<strong>IQC<\/strong>)<\/li>\n<li>In-Process Quality Control (<strong>IPQC<\/strong>)<\/li>\n<li>First Article Inspection (<strong>FAI<\/strong>)<\/li>\n<li>Outgoing Quality Control (<strong>OQC<\/strong>)<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Each stage addresses different risks in the production chain.<\/p>\n<div id=\"attachment_4577\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-4577\" class=\"wp-image-4577 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-800x347.webp\" alt=\"Four-stage quality control flow from Incoming Quality Control through Outgoing Quality Control for sheet metal production\" width=\"800\" height=\"347\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-200x87.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-300x130.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-400x173.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-500x217.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-600x260.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-700x304.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-768x333.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-800x347.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-1024x444.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-1200x520.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc-1536x666.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-control-layers-iqc-ipqc-fai-oqc.webp 1905w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-4577\" class=\"wp-caption-text\"><span style=\"color: #808080;\">The four quality control stages that cover sheet metal production from raw material to final shipment, with OQC (pre-shipment inspection) highlighted as the focus of this article.<\/span><\/p><\/div>\n<p class=\"isSelectedEnd\">The pre-shipment inspection discussed here mainly refers to the final inspection or outgoing quality control performed internally by the factory. When performed by the customer or a third-party inspection agency, it is generally called a <strong>Pre-Shipment Inspection (PSI)<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">For customers, PSI is the <strong>last reliable checkpoint before manufactured parts enter their supply chain<\/strong>.<\/p>\n<h2>Pre-Shipment Inspection Process: Step by Step<\/h2>\n<p class=\"isSelectedEnd\">PSI follows a defined sequence. Skipping any step increases the risk of defective or nonconforming products reaching the customer.<\/p>\n<div id=\"attachment_4576\" style=\"width: 610px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-4576\" class=\"wp-image-4576 size-fusion-600\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-600x824.webp\" alt=\"Six-step pre-shipment inspection process flowchart from plan review to shipment release\" width=\"600\" height=\"824\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-200x275.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-218x300.webp 218w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-400x550.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-500x687.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-600x824.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-700x962.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-745x1024.webp 745w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-768x1055.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart-800x1099.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/psi-inspection-process-steps-flowchart.webp 1070w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><p id=\"caption-attachment-4576\" class=\"wp-caption-text\"><span style=\"color: #808080;\">The six sequential steps followed during a pre-shipment inspection, showing the full process from reviewing the inspection plan to releasing the shipment.<\/span><\/p><\/div>\n<h3>Step 1 \u2014 Review the Inspection Plan<\/h3>\n<p class=\"isSelectedEnd\">Quality inspectors begin by reviewing the <a href=\"https:\/\/ceshi.baoxuanmetal.com\/sheet-metal-inspection-plan\/\"><strong data-start=\"584\" data-end=\"615\">sheet metal inspection plan<\/strong><\/a> together with the engineering drawings and purchase order (PO) to identify critical dimensions, tolerances, surface-finishing requirements and customer-specific standards.<\/p>\n<p class=\"isSelectedEnd\">For parts with <strong>Geometric Dimensioning and Tolerancing (GD&amp;T)<\/strong> requirements, the inspection plaackaging must account for the type of surface finish.n must also specify how each characteristic will be measured.<\/p>\n<h3>Step 2 \u2014 Collect Production Records<\/h3>\n<p class=\"isSelectedEnd\"><a href=\"https:\/\/ceshi.baoxuanmetal.com\/sheet-metal-material-specifications\/\"><strong data-start=\"7347\" data-end=\"7412\">Material certificates for the specified sheet metal materials<\/strong><\/a>, in-process inspection data and first article inspection reports are collected to establish the evaluation baseline.<\/p>\n<h3>Step 3 \u2014 Select the Sampling Method<\/h3>\n<p class=\"isSelectedEnd\">Production orders are generally inspected using an <strong>Acceptable Quality Limit (AQL)<\/strong> sampling plan based on ISO 2859-1.<\/p>\n<p class=\"isSelectedEnd\">Prototype and low-volume orders are usually subject to <strong>100% inspection<\/strong>, with every part measured and evaluated.<\/p>\n<h3>Step 4 \u2014 Perform Dimensional and Visual Inspections<\/h3>\n<p class=\"isSelectedEnd\">Measurements and surface evaluations are conducted according to the drawings, and all results are recorded.<\/p>\n<h3>Step 5 \u2014 Verify Quantity, Packaging and Labels<\/h3>\n<p class=\"isSelectedEnd\">The actual quantity is cross-checked against the packing list and PO. Packaging is verified according to the surface-finishing requirements, and every label field is checked.<\/p>\n<h3>Step 6 \u2014 Prepare the Report and Release the Shipment<\/h3>\n<p class=\"isSelectedEnd\">All inspection results are documented. Conforming parts are approved for shipment, while nonconforming parts are held pending a disposition decision.<\/p>\n<h2>Dimensional Verification: Confirming Critical Measurements<\/h2>\n<p class=\"isSelectedEnd\">For metal parts, dimensional verification is the most detailed part of the quality inspection process. Its main purpose is to confirm that <strong>every critical dimension falls within the tolerance specified on the drawing<\/strong>.<\/p>\n<p>Inspection equipment is selected according to the tolerance requirements. Tighter tolerances require more precise measuring instruments.<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_4578\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-4578\" class=\"wp-image-4578 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-800x533.webp\" alt=\"Digital caliper measuring a sheet metal bracket on a granite surface plate in a metrology lab\" width=\"800\" height=\"533\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-200x133.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-300x200.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-400x267.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-500x333.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-600x400.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-700x467.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-768x512.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-800x533.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-1024x683.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part-1200x800.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/dimensional-verification-caliper-sheet-metal-part.webp 1536w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-4578\" class=\"wp-caption-text\"><span style=\"color: #808080;\">A digital caliper taking a critical measurement on a sheet metal part during dimensional verification, with the tolerance requirement visible on the part sticker.<\/span><\/p><\/div>\n<p>&nbsp;<\/p>\n<\/p>\n<div class=\"table-2\">\n<table width=\"100%\">\n<thead>\n<tr>\n<th align=\"left\">Tolerance or Inspection Item<\/th>\n<th align=\"left\">Common Inspection Tools<\/th>\n<th align=\"left\">Typical Application<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td align=\"left\">General dimensions of \u00b10.5 mm or above<\/td>\n<td align=\"left\">Calipers, tape measures<\/td>\n<td align=\"left\">Non-critical overall dimensions<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">Dimensions of \u00b10.1 to \u00b10.2 mm<\/td>\n<td align=\"left\">Digital calipers, micrometers, height gauges<\/td>\n<td align=\"left\">Bend dimensions, hole diameters and sheet thickness<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">Critical dimensions of \u00b10.05 mm or below<\/td>\n<td align=\"left\">CMM, vision measuring system, height gauge or dedicated gauge<\/td>\n<td align=\"left\">Critical mating dimensions, hole positions and profiles<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">GD&amp;T callouts<\/td>\n<td align=\"left\">CMM, dedicated gauges or other measurement methods capable of establishing datum systems<\/td>\n<td align=\"left\">Flatness, position, profile and other geometric tolerances<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_4579\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-4579\" class=\"wp-image-4579 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-800x373.webp\" alt=\"Chart showing which inspection tools match different tolerance ranges from general dimensions to GD&amp;T callouts\" width=\"800\" height=\"373\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-200x93.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-300x140.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-400x187.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-500x233.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-600x280.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-700x327.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-768x358.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-800x373.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-1024x478.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-1200x560.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance-1536x717.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/inspection-tool-selection-by-tolerance.webp 1836w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-4579\" class=\"wp-caption-text\"><span style=\"color: #808080;\">A quick-reference guide matching tolerance ranges to the appropriate inspection tools, from basic calipers for general dimensions to CMMs for geometric tolerancing.<\/span><\/p><\/div>\n<p>&nbsp;<\/p>\n<p class=\"isSelectedEnd\">For sheet metal parts, we generally inspect:<\/p>\n<ul data-spread=\"false\">\n<li>Sheet thickness<\/li>\n<li>Bend angles<\/li>\n<li>Bend radii<\/li>\n<li>Hole diameters<\/li>\n<li>Hole positions<\/li>\n<li>Overall length and width<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">For parts mounted on flat surfaces or assembled with other components, we also inspect <strong>flatness and warpage<\/strong>.<\/p>\n<h2>Visual and Surface Inspection<\/h2>\n<p class=\"isSelectedEnd\">Visual inspection evaluates the surface condition and overall appearance of the parts.<\/p>\n<p class=\"isSelectedEnd\">Surface defects are among the most frequently reported issues in sheet metal manufacturing. SR MFG can also encounter such errors, but they are among the easiest problems to prevent.<\/p>\n<p class=\"isSelectedEnd\">Common defects include:<\/p>\n<ul data-spread=\"false\">\n<li>Scratches<\/li>\n<li>Dents<\/li>\n<li>Burrs<\/li>\n<li>Weld spatter<\/li>\n<li>Discoloration<\/li>\n<li>Uneven coatings<\/li>\n<li>Tool marks<\/li>\n<\/ul>\n<p>Each defect is evaluated according to its severity and application.<\/p>\n<div id=\"attachment_4580\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-4580\" class=\"wp-image-4580 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-800x533.webp\" alt=\"Powder-coated steel panel showing five marked surface defects including scratch, dent, burrs, discoloration, and weld spatter\" width=\"800\" height=\"533\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-200x133.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-300x200.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-400x267.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-500x333.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-600x400.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-700x467.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-768x512.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-800x533.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-1024x683.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel-1200x800.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/common-surface-defects-sheet-metal-panel.webp 1536w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-4580\" class=\"wp-caption-text\"><span style=\"color: #808080;\">A powder-coated sheet metal panel with five typical surface defects marked for inspection \u2014 scratches, dents, burrs, discoloration, and weld spatter are among the most common issues found during visual inspection.<\/span><\/p><\/div>\n<p>&nbsp;<\/p>\n<\/p>\n<div class=\"table-2\">\n<table width=\"100%\">\n<thead>\n<tr>\n<th align=\"left\">Severity<\/th>\n<th align=\"left\">Acceptance Criteria<\/th>\n<th align=\"left\">Disposition<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td align=\"left\">Critical<\/td>\n<td align=\"left\">Affects function, safety or assembly, such as weld cracks, missing holes or mixed materials<\/td>\n<td align=\"left\">Reject<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">Major<\/td>\n<td align=\"left\">Affects appearance or durability but not function, such as deep scratches on visible surfaces or coatings outside specification<\/td>\n<td align=\"left\">Discuss with the customer<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">Minor<\/td>\n<td align=\"left\">Cosmetic imperfections within the acceptable range, such as slight tooling marks on non-visible surfaces<\/td>\n<td align=\"left\">Record and ship normally<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_4581\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-4581\" class=\"wp-image-4581 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-800x333.webp\" alt=\"Three-level defect severity classification from critical (reject) to major (discuss) to minor (ship normally)\" width=\"800\" height=\"333\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-200x83.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-300x125.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-400x167.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-500x208.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-600x250.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-700x292.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-768x320.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-800x333.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-1024x427.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-1200x500.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/defect-severity-classification-critical-major-minor-1536x640.webp 1536w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-4581\" class=\"wp-caption-text\"><span style=\"color: #808080;\">The three severity levels used to classify surface defects during inspection \u2014 critical defects require rejection, major defects need customer discussion, and minor defects are recorded and accepted.<\/span><\/p><\/div>\n<p>&nbsp;<\/p>\n<p class=\"isSelectedEnd\">The above criteria are for reference only. The final standard depends on the specific application.<\/p>\n<h2>Quantity, Packaging and Label Verification<\/h2>\n<p class=\"isSelectedEnd\">These three items are often treated as supporting checks, but errors in these areas may occur more frequently than many product defects. They are also preventable.<\/p>\n<h3>Quantity Verification<\/h3>\n<p class=\"isSelectedEnd\">For orders containing multiple part types or packed in several cartons, a three-way cross-check should be used:<\/p>\n<ul data-spread=\"false\">\n<li>Actual quantity per carton vs. packing list<\/li>\n<li>Packing list vs. purchase order<\/li>\n<li>Total shipment quantity vs. purchase-order line items<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">This helps identify both over-shipments and shortages before the goods leave the factory.<\/p>\n<h3>Packaging Verification<\/h3>\n<p class=\"isSelectedEnd\">Packaging must account for the <a href=\"https:\/\/ceshi.baoxuanmetal.com\/sheet-metal-finishing-services\/\"><strong data-start=\"1214\" data-end=\"1247\">sheet metal finishing process<\/strong><\/a> applied to the parts.<\/p>\n<p class=\"isSelectedEnd\">Powder-coated parts should be separated with <strong>PE film or EPE foam<\/strong> to prevent impact damage and coating loss.<\/p>\n<p class=\"isSelectedEnd\"><a href=\"https:\/\/ceshi.baoxuanmetal.com\/sheet-metal-finishing-services\/metal-plating-services\/\"><strong data-start=\"5439\" data-end=\"5468\">Electroplated metal parts<\/strong><\/a> and anodized parts are sensitive to humidity during long-distance sea transport and may require desiccants or sealed packaging.<\/p>\n<p class=\"isSelectedEnd\">Bare metal parts without surface treatment require rust protection, such as <strong>rust-preventive oil or VCI bags<\/strong>, especially for shipments with long transit times.<\/p>\n<div id=\"attachment_4582\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-4582\" class=\"wp-image-4582 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-800x533.webp\" alt=\"Open shipping crate showing three packaging methods: PE film for coated parts, sealed bags with desiccants for plated parts, and VCI bags for bare metal\" width=\"800\" height=\"533\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-200x133.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-300x200.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-400x267.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-500x333.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-600x400.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-700x467.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-768x512.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-800x533.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-1024x683.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags-1200x800.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/packaging-methods-surface-finish-pe-film-vci-bags.webp 1536w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-4582\" class=\"wp-caption-text\"><span style=\"color: #808080;\">Three packaging approaches used for sheet metal parts depending on surface finish \u2014 PE film separates coated parts, sealed bags with desiccants protect plated parts, and VCI bags prevent rust on bare metal.<\/span><\/p><\/div>\n<h3>Label Verification<\/h3>\n<p class=\"isSelectedEnd\">Every label field should be checked against the PO and packing list:<\/p>\n<ul data-spread=\"false\">\n<li>Part number<\/li>\n<li>Drawing number and revision<\/li>\n<li>Quantity per carton<\/li>\n<li>Batch number<\/li>\n<li>Gross and net weight<\/li>\n<li>Delivery destination<\/li>\n<li>Country-of-origin marking required by the destination country<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">An incorrect part number or missing revision number may cause customs-clearance delays, warehouse receiving errors or production-line stoppages while confirmation is pending.<\/p>\n<div id=\"attachment_4583\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-4583\" class=\"wp-image-4583 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-800x533.webp\" alt=\"Close-up of shipping label on carton showing part number, revision, quantity, and destination fields with cross-reference to purchase order\" width=\"800\" height=\"533\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-200x133.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-300x200.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-400x267.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-500x333.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-600x400.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-700x467.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-768x512.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-800x533.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-1024x683.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report-1200x800.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/quality-documents-spread-coc-mtr-fai-report.webp 1536w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-4583\" class=\"wp-caption-text\"><span style=\"color: #808080;\">A shipping label being cross-checked against the purchase order \u2014 every field including part number, revision, quantity, weight, and destination must match before the carton is cleared for shipment.<\/span><\/p><\/div>\n<h2>Quality Documents Supplied with the Shipment<\/h2>\n<p class=\"isSelectedEnd\">Quality documents serve three important purposes:<\/p>\n<ol start=\"1\" data-spread=\"false\">\n<li>They provide traceability for the customer.<\/li>\n<li>They provide data that allows the incoming quality-control team to decide whether to accept or hold the batch.<\/li>\n<li>They provide a reference if problems occur later.<\/li>\n<\/ol>\n<p>Specific requirements depend on the customer and industry. The following are standard documents for most sheet metal manufacturing orders:<\/p>\n<p>&nbsp;<\/p>\n<\/p>\n<div class=\"table-2\">\n<table width=\"100%\">\n<thead>\n<tr>\n<th align=\"left\">Document<\/th>\n<th align=\"left\">Content<\/th>\n<th align=\"left\">Purpose<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td align=\"left\">Certificate of Conformance (COC)<\/td>\n<td align=\"left\">Declares that the parts comply with drawing specifications<\/td>\n<td align=\"left\">Basis for incoming acceptance<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">Dimensional Inspection Report<\/td>\n<td align=\"left\">Compares measured values with drawing tolerances<\/td>\n<td align=\"left\">IQC data verification<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">Material Test Report (MTR)<\/td>\n<td align=\"left\">Chemical-composition and mechanical-property data<\/td>\n<td align=\"left\">Material traceability<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">First Article Inspection Report<\/td>\n<td align=\"left\">Full dimensional inspection report for a new part or design revision<\/td>\n<td align=\"left\">Process-capability confirmation<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">Surface Treatment Report<\/td>\n<td align=\"left\">Coating thickness, adhesion and salt-spray test data<\/td>\n<td align=\"left\">Surface-treatment traceability<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">Packing List<\/td>\n<td align=\"left\">Part details, quantities and weights for each carton<\/td>\n<td align=\"left\">Receiving verification<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_4584\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-4584\" class=\"wp-image-4584 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-800x533.webp\" alt=\"Six quality documents fanned out on a desk including Certificate of Conformance, inspection report, material test report, FAI report, surface treatment report, and packing list\" width=\"800\" height=\"533\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-200x133.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-300x200.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-400x267.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-500x333.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-600x400.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-700x467.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-768x512.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-800x533.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-1024x683.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup-1200x800.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/07\/shipping-label-verification-carton-closeup.webp 1536w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-4584\" class=\"wp-caption-text\"><span style=\"color: #808080;\">The standard set of quality documents that accompany a sheet metal shipment \u2014 from the Certificate of Conformance and dimensional report to material certificates and packing lists, each providing traceability and verification data.<\/span><\/p><\/div>\n<p>&nbsp;<\/p>\n<p class=\"isSelectedEnd\">These requirements should be specified in the <strong>RFQ at the beginning of the purchasing process<\/strong>, rather than added after production has been completed.<\/p>\n<p class=\"isSelectedEnd\">Early specification ensures that the supplier includes document preparation in the production workflow instead of preparing the documents at the last minute before shipment.<\/p>\n<h2>How SR-MFG Supports Your Pre-Shipment Inspection<\/h2>\n<p class=\"isSelectedEnd\">At SR-MFG, our <a href=\"https:\/\/ceshi.baoxuanmetal.com\/quality-control-inspection\/\"><strong data-start=\"1761\" data-end=\"1803\">quality control and inspection process<\/strong><\/a> is integrated into the production workflow rather than treated as a final add-on before shipment.<\/p>\n<p class=\"isSelectedEnd\">For every order, we follow an inspection process based on the drawing specifications and the customer requirements confirmed during the order-review stage.<\/p>\n<p class=\"isSelectedEnd\">If you require additional documents, such as a first article inspection report, material certificates or photographs of the packaging and labels, please inform us during the quotation stage so they can be included in the order process.<\/p>\n<p class=\"isSelectedEnd\"><strong>Ready to start?<\/strong> To help us provide an accurate manufacturing assessment, please provide your 2D drawings or 3D files, material and sheet-thickness requirements, quantities, surface-finishing specifications, tolerance requirements, application environment and packaging preferences.<\/p>\n<p><a href=\"https:\/\/ceshi.baoxuanmetal.com\/contact-us\/\"><span class=\"text-token-text-primary cursor-text rounded-sm\" data-placeholder-token=\"true\">[Upload Your Files for a Quote \u2192]<\/span><\/a><\/p>\n<div class=\"accordian fusion-accordian\" style=\"--awb-border-size:1px;--awb-icon-size:16px;--awb-content-font-size:var(--awb-typography4-font-size);--awb-icon-alignment:left;--awb-hover-color:var(--awb-color2);--awb-border-color:var(--awb-color3);--awb-background-color:var(--awb-color1);--awb-divider-color:var(--awb-color3);--awb-divider-hover-color:var(--awb-color3);--awb-icon-color:var(--awb-color1);--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);--awb-icon-box-color:var(--awb-color8);--awb-toggle-hover-accent-color:var(--awb-color5);--awb-title-font-family:var(--awb-typography1-font-family);--awb-title-font-weight:var(--awb-typography1-font-weight);--awb-title-font-style:var(--awb-typography1-font-style);--awb-title-font-size:16px;--awb-title-letter-spacing:var(--awb-typography1-letter-spacing);--awb-title-line-height:var(--awb-typography1-line-height);--awb-content-font-family:var(--awb-typography4-font-family);--awb-content-font-weight:var(--awb-typography4-font-weight);--awb-content-font-style:var(--awb-typography4-font-style);\"><div class=\"panel-group fusion-toggle-icon-boxed\" id=\"accordion-4573-1\"><div class=\"fusion-panel panel-default panel-53288cc764ffb9fa0 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_53288cc764ffb9fa0\"><a aria-expanded=\"false\" aria-controls=\"53288cc764ffb9fa0\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-4573-1\" data-target=\"#53288cc764ffb9fa0\" href=\"#53288cc764ffb9fa0\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">What is the difference between pre-shipment inspection and Incoming Quality Control (IQC)?<\/span><\/a><\/h4><\/div><div id=\"53288cc764ffb9fa0\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_53288cc764ffb9fa0\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p class=\"isSelectedEnd\">PSI is performed by the manufacturer before the parts leave the factory. IQC is performed by the buyer after the parts arrive at its facility.<\/p>\n<p>PSI identifies problems before shipment, while IQC provides a second line of defence after delivery. The strongest quality-control cooperation uses both: sharing the PSI report in advance allows the IQC team to know what to expect.<\/p>\n<p><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-55e805e54b604c4f6 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_55e805e54b604c4f6\"><a aria-expanded=\"false\" aria-controls=\"55e805e54b604c4f6\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-4573-1\" data-target=\"#55e805e54b604c4f6\" href=\"#55e805e54b604c4f6\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">Should I request 100% inspection or AQL sampling?<\/span><\/a><\/h4><\/div><div id=\"55e805e54b604c4f6\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_55e805e54b604c4f6\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p class=\"isSelectedEnd\"><strong>100% inspection<\/strong> is suitable for prototype orders, first production runs and parts with critical tolerances or safety requirements.<\/p>\n<p class=\"isSelectedEnd\">AQL sampling based on ISO 2859-1 is standard practice for production batches. The sample size depends on the batch size and agreed inspection level.<\/p>\n<p>Discuss the sampling plan with the supplier before production begins.<\/p>\n<p><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-e5ad6f591f3d0a7f2 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_e5ad6f591f3d0a7f2\"><a aria-expanded=\"false\" aria-controls=\"e5ad6f591f3d0a7f2\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-4573-1\" data-target=\"#e5ad6f591f3d0a7f2\" href=\"#e5ad6f591f3d0a7f2\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">What happens if defects are found during pre-shipment inspection?<\/span><\/a><\/h4><\/div><div id=\"e5ad6f591f3d0a7f2\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_e5ad6f591f3d0a7f2\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p class=\"isSelectedEnd\">Nonconforming parts are held. Depending on the severity, one of three dispositions is selected:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Rework:<\/strong> Correct the defect and reinspect the part.<\/li>\n<li><strong>Use-as-is acceptance:<\/strong> Accept a minor deviation within an agreed tolerance, subject to customer approval.<\/li>\n<li><strong>Scrap:<\/strong> Remove parts with irreparable defects from the shipment batch.<\/li>\n<\/ul>\n<p>All disposition decisions are recorded in the inspection report.<\/p>\n<p><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-ab13bef7bfc703f08 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_ab13bef7bfc703f08\"><a aria-expanded=\"false\" aria-controls=\"ab13bef7bfc703f08\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-4573-1\" data-target=\"#ab13bef7bfc703f08\" href=\"#ab13bef7bfc703f08\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">Which quality documents should I request from a sheet metal supplier?<\/span><\/a><\/h4><\/div><div id=\"ab13bef7bfc703f08\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_ab13bef7bfc703f08\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p class=\"isSelectedEnd\">At minimum, request a <strong>Certificate of Conformance (COC)<\/strong> and a dimensional inspection report.<\/p>\n<p class=\"isSelectedEnd\">For new parts or design changes, also request a <strong>First Article Inspection (FAI) report<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">For regulated industries such as aerospace or medical manufacturing, request a <strong>Material Test Report (MTR)<\/strong>.<\/p>\n<p>When surface treatment is involved, request a surface-treatment report containing coating-thickness and adhesion data.<\/p>\n<p><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-cc0822e96339f7c37 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_cc0822e96339f7c37\"><a aria-expanded=\"false\" aria-controls=\"cc0822e96339f7c37\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-4573-1\" data-target=\"#cc0822e96339f7c37\" href=\"#cc0822e96339f7c37\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">How does inspection differ between prototypes and production batches?<\/span><\/a><\/h4><\/div><div id=\"cc0822e96339f7c37\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_cc0822e96339f7c37\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p class=\"isSelectedEnd\">Prototype orders receive <strong>100% inspection<\/strong>. Every part and every critical dimension is measured, and a detailed report is issued.<\/p>\n<p class=\"isSelectedEnd\">Production orders use AQL sampling, focusing on process stability and batch consistency rather than inspecting every part.<\/p>\n<p>For the first production run, a complete FAI report confirms the process baseline. Subsequent orders then move to sampling-based inspection.<\/p>\n<p><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pre-shipment inspection is the final quality-control step performed before sheet  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":4575,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[129],"tags":[],"class_list":["post-4573","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-quality-control-inspection-articles"],"acf":[],"_links":{"self":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/posts\/4573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/comments?post=4573"}],"version-history":[{"count":4,"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/posts\/4573\/revisions"}],"predecessor-version":[{"id":4995,"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/posts\/4573\/revisions\/4995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/media\/4575"}],"wp:attachment":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/media?parent=4573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/categories?post=4573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/de\/wp-json\/wp\/v2\/tags?post=4573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}