{"id":3671,"date":"2026-05-22T06:36:52","date_gmt":"2026-05-22T06:36:52","guid":{"rendered":"https:\/\/ceshi.baoxuanmetal.com\/?p=3671"},"modified":"2026-07-04T08:27:08","modified_gmt":"2026-07-04T08:27:08","slug":"rfq","status":"publish","type":"post","link":"https:\/\/ceshi.baoxuanmetal.com\/rfq\/","title":{"rendered":"RFQ"},"content":{"rendered":"<blockquote><p>Note: In some industries, especially construction and government services, RFQ may also mean <strong data-start=\"785\" data-end=\"815\">Request for Qualifications<\/strong>. That process focuses on evaluating supplier capability rather than pricing. This article focuses on the meaning of RFQ in <strong data-start=\"939\" data-end=\"968\">manufacturing procurement<\/strong>.<\/p><\/blockquote>\n<h2 data-section-id=\"wyle68\" data-start=\"976\" data-end=\"994\">What Is an RFQ?<\/h2>\n<p data-start=\"996\" data-end=\"1353\">An <strong data-start=\"999\" data-end=\"1089\">RFQ is a procurement document used when the buyer already knows exactly what they need<\/strong>. The design is finalized, the material is selected, and the quantity is confirmed or estimated. The main purpose is to collect comparable information from different suppliers, including price, quality capability, factory conditions, certifications, and lead time.<\/p>\n<p data-start=\"1355\" data-end=\"1507\">An RFQ helps buyers make a <strong data-start=\"1382\" data-end=\"1424\">rational, data-based sourcing decision<\/strong> instead of choosing a supplier based only on instinct or the lowest visible price.<\/p>\n<p data-start=\"1509\" data-end=\"1721\">However, an RFQ is <strong data-start=\"1528\" data-end=\"1546\">not a contract<\/strong>. It is a request for information and pricing. A legally binding agreement is usually formed only after the buyer issues a <strong data-start=\"1669\" data-end=\"1692\">purchase order (PO)<\/strong> and the supplier accepts it.<\/p>\n<h2 data-section-id=\"1awmvqw\" data-start=\"1728\" data-end=\"1776\">Key Differences Between RFQ, RFI, RFP, and PO<\/h2>\n<\/p>\n<div class=\"table-2\">\n<table width=\"100%\">\n<thead>\n<tr>\n<th align=\"left\">Document<\/th>\n<th align=\"left\">Purpose<\/th>\n<th align=\"left\">When to Use It<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td align=\"left\"><strong>RFI \u2014 Request for Information<\/strong><\/td>\n<td align=\"left\">Collect general information about suppliers and their capabilities<\/td>\n<td align=\"left\">Early research stage, before the design is finalized<\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><strong>RFP \u2014 Request for Proposal<\/strong><\/td>\n<td align=\"left\">Ask suppliers to propose a solution for a defined problem<\/td>\n<td align=\"left\">The buyer knows the goal but is not sure about the exact method or design<\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><strong>RFQ \u2014 Request for Quotation<\/strong><\/td>\n<td align=\"left\">Obtain pricing for a product with fully defined specifications<\/td>\n<td align=\"left\">The design, material, quantity, and requirements are already clear<\/td>\n<\/tr>\n<tr>\n<td align=\"left\"><strong>PO \u2014 Purchase Order<\/strong><\/td>\n<td align=\"left\">Confirm the order and agreed terms with the selected supplier<\/td>\n<td align=\"left\">After the RFQ process is completed and a supplier has been selected<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>\n<div id=\"attachment_3676\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-3676\" class=\"wp-image-3676 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-800x450.webp\" alt=\"Flow diagram comparing RFI, RFP, RFQ, and PO stages in the manufacturing procurement process\" width=\"800\" height=\"450\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-2.webp 1672w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3676\" class=\"wp-caption-text\"><span style=\"color: #808080;\">The four key procurement documents serve different purposes: RFI gathers supplier information, RFP requests proposed solutions, RFQ obtains pricing for defined specifications, and PO confirms the order.<\/span><\/p><\/div>\n<h2 data-section-id=\"1gqa1d9\" data-start=\"2503\" data-end=\"2533\">When Should You Use an RFQ?<\/h2>\n<p data-start=\"2535\" data-end=\"2602\">You should use an RFQ when all of the following conditions are met:<\/p>\n<ul data-start=\"2604\" data-end=\"2917\">\n<li data-section-id=\"q2tcrv\" data-start=\"2604\" data-end=\"2695\">The part design has been finalized, and <strong data-start=\"2646\" data-end=\"2680\">dimensioned technical drawings<\/strong> are available.<\/li>\n<li data-section-id=\"1ghi3lt\" data-start=\"2696\" data-end=\"2762\">The <strong data-start=\"2702\" data-end=\"2741\">material type, grade, and thickness<\/strong> have been confirmed.<\/li>\n<li data-section-id=\"6a7x9m\" data-start=\"2763\" data-end=\"2833\">The quantity, or at least the estimated production volume, is known.<\/li>\n<li data-section-id=\"neaor6\" data-start=\"2834\" data-end=\"2917\">The <strong data-start=\"2840\" data-end=\"2896\">surface finish, tolerances, and quality requirements<\/strong> are clearly defined.<\/li>\n<\/ul>\n<p data-start=\"2919\" data-end=\"3122\">If the design is still at the concept stage and you need the supplier to provide manufacturability advice, cost optimization suggestions, or alternative solutions, an <strong data-start=\"3086\" data-end=\"3100\">RFI or RFP<\/strong> may be more suitable.<\/p>\n<p data-start=\"3124\" data-end=\"3246\">Sending an RFQ with incomplete information often leads to <strong data-start=\"3182\" data-end=\"3245\">inaccurate pricing, repeated communication, and wasted time<\/strong>.<\/p>\n<h2 data-section-id=\"1bnfdj3\" data-start=\"3253\" data-end=\"3294\">What Should a Sheet Metal RFQ Include?<\/h2>\n<p data-start=\"3296\" data-end=\"3511\">The accuracy of a supplier\u2019s quotation depends heavily on the quality of the RFQ package provided by the buyer. A well-prepared RFQ can significantly reduce back-and-forth communication and prevent quotation errors.<\/p>\n<div id=\"attachment_3677\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-3677\" class=\"wp-image-3677 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-800x450.webp\" alt=\"Flat lay of sheet metal RFQ documents including 2D drawing, 3D CAD model, BOM, and DXF flat pattern file\" width=\"800\" height=\"450\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-3.webp 1672w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3677\" class=\"wp-caption-text\"><span style=\"color: #808080;\">A complete sheet metal RFQ package should include 2D dimensioned drawings, 3D CAD files, a Bill of Materials, and DXF flat patterns when applicable \u2014 each file type serves a different purpose in the quotation and manufacturing process.<\/span><\/p><\/div>\n<h3 data-section-id=\"ct959w\" data-start=\"3513\" data-end=\"3551\">Engineering Drawings and CAD Files<\/h3>\n<p data-start=\"3553\" data-end=\"3811\">Provide a <strong><a href=\"https:\/\/ceshi.baoxuanmetal.com\/technical-drawing\/\">2D dimensioned technical drawing<\/a><\/strong> in PDF format for reference and a 3D CAD file, such as STEP or IGES, for manufacturing review. For <a href=\"https:\/\/ceshi.baoxuanmetal.com\/custom-sheet-metal-fabrication-for-global-oems\/laser-cutting-services-oem\/\">laser cutting and other flat-pattern processes<\/a>, such as punching or stamping, a DXF flat pattern file may also be required.<\/p>\n<p data-start=\"3813\" data-end=\"3946\">Without proper drawings, suppliers may misunderstand the geometry, which can result in incorrect quotations or production deviations.<\/p>\n<h3 data-section-id=\"1joxnxk\" data-start=\"3948\" data-end=\"3975\">Bill of Materials \u2014 BOM<\/h3>\n<p data-start=\"3977\" data-end=\"4143\">For assemblies or multi-part orders, include a <strong data-start=\"4024\" data-end=\"4051\">Bill of Materials (BOM)<\/strong>. The BOM should list each part number, description, material, quantity, and revision level.<\/p>\n<p data-start=\"4145\" data-end=\"4250\">A missing or outdated BOM is one of the most common causes of quotation mistakes in sheet metal projects.<\/p>\n<h3 data-section-id=\"11t7xs3\" data-start=\"4252\" data-end=\"4279\">Material Specifications<\/h3>\n<p data-start=\"4281\" data-end=\"4380\">Writing only \u201csteel\u201d or \u201caluminum\u201d is not enough. A complete material specification should include:<\/p>\n<div id=\"attachment_3678\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-3678\" class=\"wp-image-3678 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-800x450.webp\" alt=\"Sheet metal material samples showing cold rolled steel, 304 stainless steel, aluminum 5052, and galvanized steel surface textures\" width=\"800\" height=\"450\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-4.webp 1672w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3678\" class=\"wp-caption-text\"><span style=\"color: #808080;\">Different sheet metal materials have distinct surface appearances, cost levels, and manufacturing characteristics. Specifying the exact material grade in an RFQ \u2014 not just &#8220;steel&#8221; or &#8220;aluminum&#8221; \u2014 helps suppliers provide accurate and comparable quotations.<\/span><\/p><\/div>\n<ul data-start=\"4382\" data-end=\"4624\">\n<li data-section-id=\"elxla6\" data-start=\"4382\" data-end=\"4476\">Material grade, such as <strong data-start=\"4408\" data-end=\"4476\">304 stainless steel, 5052-H32 aluminum, or SGCC galvanized steel<\/strong><\/li>\n<li data-section-id=\"1vh58r9\" data-start=\"4477\" data-end=\"4497\">Material thickness<\/li>\n<li data-section-id=\"fagk0w\" data-start=\"4498\" data-end=\"4549\">Applicable standard, such as <strong data-start=\"4529\" data-end=\"4549\">ASTM, EN, or JIS<\/strong><\/li>\n<li data-section-id=\"pubyhq\" data-start=\"4550\" data-end=\"4624\">Special requirements, such as rolling direction or surface quality grade<\/li>\n<\/ul>\n<p data-start=\"4626\" data-end=\"4735\"><strong data-start=\"4626\" data-end=\"4735\">Material selection directly affects cost, manufacturability, surface finish compatibility, and lead time.<\/strong><\/p>\n<h3 data-section-id=\"9967zk\" data-start=\"4737\" data-end=\"4767\">Quantity and Order Pattern<\/h3>\n<p data-start=\"4769\" data-end=\"4878\">Clearly state the quantity required for quotation. It is also helpful to provide additional context, such as:<\/p>\n<ul data-start=\"4880\" data-end=\"5020\">\n<li data-section-id=\"1d02zs8\" data-start=\"4880\" data-end=\"4920\">Is this a <strong data-start=\"4892\" data-end=\"4919\">5-piece prototype order<\/strong>?<\/li>\n<li data-section-id=\"udi13l\" data-start=\"4921\" data-end=\"4968\">Is it a <strong data-start=\"4931\" data-end=\"4967\">200-piece first production batch<\/strong>?<\/li>\n<li data-section-id=\"iq3g9b\" data-start=\"4969\" data-end=\"5020\">Is it a <strong data-start=\"4979\" data-end=\"5019\">10,000-piece annual production order<\/strong>?<\/li>\n<\/ul>\n<p data-start=\"5022\" data-end=\"5186\">Unit prices can vary significantly between quantity levels because programming, setup, tooling, fixture costs, and material utilization are distributed differently.<\/p>\n<p data-start=\"5188\" data-end=\"5306\">If repeat orders are expected, mention this in the RFQ. Suppliers may offer better pricing based on the annual volume.<\/p>\n<h3 data-section-id=\"jdkcau\" data-start=\"5308\" data-end=\"5351\">Tolerances and Dimensional Requirements<\/h3>\n<p data-start=\"5353\" data-end=\"5509\">Separate <strong data-start=\"5362\" data-end=\"5384\">general tolerances<\/strong> from critical dimensions that require tighter control. General tolerances are often based on standards such as <strong data-start=\"5496\" data-end=\"5508\">ISO 2768<\/strong>.<\/p>\n<p data-start=\"5511\" data-end=\"5659\">If certain features require GD&amp;T controls, such as flatness, perpendicularity, or position tolerance, these should be clearly marked on the drawing.<\/p>\n<p data-start=\"5661\" data-end=\"5826\"><strong data-start=\"5661\" data-end=\"5741\">The tighter the tolerance, the higher the manufacturing and inspection cost.<\/strong> Tolerances should only be tightened when the function of the part truly requires it.<\/p>\n<h3 data-section-id=\"hrg5os\" data-start=\"5828\" data-end=\"5859\">Surface Finish Requirements<\/h3>\n<p data-start=\"5861\" data-end=\"5909\">When defining<a href=\"https:\/\/ceshi.baoxuanmetal.com\/sheet-metal-finishing-services\/\"> sheet metal surface finishing requirements<\/a>, specify the required surface treatment, such as powder coating, anodizing, galvanizing, brushing, passivation, e-coating, or electroplating.<\/p>\n<div id=\"attachment_3680\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-3680\" class=\"wp-image-3680 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-800x450.webp\" alt=\"Six sheet metal surface finish samples including powder coating, anodizing, brushed stainless, zinc plating, e-coating, and mirror polish\" width=\"800\" height=\"450\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-6.webp 1672w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3680\" class=\"wp-caption-text\"><span style=\"color: #808080;\">Common sheet metal surface finishes vary widely in appearance, cost, and lead time. Clearly specifying the finish type, color code, coating thickness, and masking requirements in an RFQ helps prevent miscommunication and ensures accurate pricing.<\/span><\/p><\/div>\n<p data-start=\"6009\" data-end=\"6132\">Also provide the color code, such as <strong data-start=\"6046\" data-end=\"6064\">RAL or Pantone<\/strong>, coating thickness, texture requirements, and masking requirements.<\/p>\n<p data-start=\"6134\" data-end=\"6298\">If some surfaces are cosmetic and others are functional, mark them clearly on the drawing. <strong data-start=\"6225\" data-end=\"6298\">Surface finishing can have a major impact on both cost and lead time.<\/strong><\/p>\n<h3 data-section-id=\"10h9vd1\" data-start=\"6300\" data-end=\"6337\">Welding and Hardware Requirements<\/h3>\n<p data-start=\"6339\" data-end=\"6606\">If welding is required, specify the <a href=\"https:\/\/ceshi.baoxuanmetal.com\/custom-sheet-metal-fabrication-for-global-oems\/sheet-metal-welding-services\/\">sheet metal welding method<\/a>, such as TIG welding, MIG welding, spot welding, or laser welding. The RFQ should also define welding locations, quality standards, and inspection requirements, such as visual inspection or dye penetrant testing.<\/p>\n<p data-start=\"6608\" data-end=\"6760\">For <a href=\"https:\/\/ceshi.baoxuanmetal.com\/product\/custom-sheet-metal-parts-with-pem-nuts\/\">sheet metal parts with PEM nuts and threaded inserts<\/a>, provide the part numbers, quantities, and installation positions.<\/p>\n<h3 data-section-id=\"12jv1jo\" data-start=\"6762\" data-end=\"6787\">Assembly Requirements<\/h3>\n<p data-start=\"6789\" data-end=\"6900\">If the RFQ involves an assembly instead of a single part, provide an assembly drawing or assembly instructions.<\/p>\n<p data-start=\"6902\" data-end=\"7059\">List all fasteners, adhesives, or joining methods. Also clarify whether the supplier should quote <strong data-start=\"7000\" data-end=\"7025\">individual parts only<\/strong> or a <strong data-start=\"7031\" data-end=\"7058\">fully assembled product<\/strong>.<\/p>\n<h3 data-section-id=\"5e7lgy\" data-start=\"7061\" data-end=\"7100\">Quality and Inspection Requirements<\/h3>\n<p data-start=\"7102\" data-end=\"7148\">Define the expected inspection level, such as:<\/p>\n<ul data-start=\"7150\" data-end=\"7252\">\n<li data-section-id=\"vluvhk\" data-start=\"7150\" data-end=\"7183\">Dimensional sampling inspection<\/li>\n<li data-section-id=\"ah7k2g\" data-start=\"7184\" data-end=\"7213\">Full dimensional inspection<\/li>\n<li data-section-id=\"258ezl\" data-start=\"7214\" data-end=\"7231\">CMM measurement<\/li>\n<li data-section-id=\"gl30c1\" data-start=\"7232\" data-end=\"7252\">Functional testing<\/li>\n<\/ul>\n<p data-start=\"7254\" data-end=\"7359\">If a <strong data-start=\"7259\" data-end=\"7300\">First Article Inspection (FAI) report<\/strong> is required before mass production, mention it in the RFQ.<\/p>\n<p data-start=\"7361\" data-end=\"7497\">Also state whether you need material certificates, RoHS or REACH compliance documents, <a href=\"https:\/\/ceshi.baoxuanmetal.com\/quality-control-inspection\/\">inspection reports and other quality record<\/a>s.<\/p>\n<h3 data-section-id=\"wvbhgs\" data-start=\"7499\" data-end=\"7538\">Packaging and Shipping Requirements<\/h3>\n<p data-start=\"7540\" data-end=\"7756\">Clarify whether the parts require individual packaging or bulk packaging. Also specify cosmetic surface protection, export packaging, palletizing requirements, and applicable trade terms such as <strong data-start=\"7735\" data-end=\"7755\">FOB, CIF, or DDP<\/strong>.<\/p>\n<p data-start=\"7758\" data-end=\"7890\">Unclear packaging requirements often lead to damaged parts on arrival. These problems can usually be prevented during the RFQ stage.<\/p>\n<h3 data-section-id=\"1kftc87\" data-start=\"7892\" data-end=\"7912\">Commercial Terms<\/h3>\n<p data-start=\"7914\" data-end=\"8066\">Include quotation validity, payment terms such as <strong data-start=\"7964\" data-end=\"7984\">Net 30 or Net 60<\/strong>, currency, and how one-time engineering costs or tooling costs should be handled.<\/p>\n<p data-start=\"8068\" data-end=\"8260\">If you have a target unit price or budget range, sharing it may help the supplier optimize the manufacturing solution. Whether to disclose this information depends on your purchasing strategy.<\/p>\n<h2 data-section-id=\"vshr0f\" data-start=\"8267\" data-end=\"8312\">How Does the Sheet Metal RFQ Process Work?<\/h2>\n<p data-start=\"8314\" data-end=\"8365\">A typical sheet metal RFQ process works as follows:<\/p>\n<div id=\"attachment_3673\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-3673\" class=\"wp-image-3673 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-800x450.webp\" alt=\"Eight-step flowchart showing the complete sheet metal RFQ process from buyer preparation through supplier selection and purchase order\" width=\"800\" height=\"450\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-9.webp 1672w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3673\" class=\"wp-caption-text\"><span style=\"color: #808080;\">The sheet metal RFQ process typically follows eight steps \u2014 from the buyer preparing the RFQ package, through supplier quotation and DFM review, to final supplier selection and purchase order issuance.<\/span><\/p><\/div>\n<p data-start=\"8314\" data-end=\"8365\"><\/p>\n<div class=\"table-2\">\n<table width=\"100%\">\n<thead>\n<tr>\n<th align=\"left\">Step<\/th>\n<th align=\"left\">Action<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td align=\"left\">1<\/td>\n<td align=\"left\">The buyer prepares the RFQ package, including drawings, BOM, material specifications, quantities, surface finish requirements, tolerances, and commercial terms<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">2<\/td>\n<td align=\"left\">The buyer screens and selects qualified suppliers<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">3<\/td>\n<td align=\"left\">The RFQ is sent to selected suppliers with a quotation deadline<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">4<\/td>\n<td align=\"left\">Suppliers review the drawings, perform a DFM check, and calculate costs<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">5<\/td>\n<td align=\"left\">Suppliers submit quotations, including unit price, tooling cost, lead time, and terms<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">6<\/td>\n<td align=\"left\">The buyer compares quotations based on total cost, not only unit price<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">7<\/td>\n<td align=\"left\">Clarification and negotiation take place; DFM feedback may lead to design adjustments<\/td>\n<\/tr>\n<tr>\n<td align=\"left\">8<\/td>\n<td align=\"left\">The buyer selects a supplier and issues a purchase order<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p data-start=\"8314\" data-end=\"8365\"><\/p>\n<blockquote>\n<p data-start=\"9106\" data-end=\"9157\">Quotation response time depends on part complexity.<\/p>\n<p data-start=\"9159\" data-end=\"9405\">For <a href=\"https:\/\/ceshi.baoxuanmetal.com\/product\/welded-machine-base-frames\/\">welded machine base frames and similar complex assemblies<\/a> involving welding, multiple surface treatments, and tight tolerances, the quotation process may take 5\u201310 business days.<\/p>\n<\/blockquote>\n<h2 data-section-id=\"1vxka3m\" data-start=\"9412\" data-end=\"9468\">Key Factors That Affect Sheet Metal Quotation Pricing<\/h2>\n<h3 data-section-id=\"19celc6\" data-start=\"9470\" data-end=\"9487\">Material Cost<\/h3>\n<p data-start=\"9489\" data-end=\"9704\"><a href=\"https:\/\/ceshi.baoxuanmetal.com\/material-grade-definition-standards-and-selection-in-sheet-metal-fabrication\/\">Sheet metal material grade<\/a>, thickness, and market price all affect the base cost. Thicker sheet metal usually increases material cost, while specialty alloys such as <strong data-start=\"9643\" data-end=\"9684\">316L stainless steel or 5083 aluminum<\/strong> are more expensive.<\/p>\n<p data-start=\"9706\" data-end=\"9888\">Material utilization also matters. This refers to how efficiently parts can be nested on a standard sheet. It can have a noticeable impact on cost, especially for small-batch orders.<\/p>\n<h3 data-section-id=\"14rur42\" data-start=\"9890\" data-end=\"9930\">Manufacturing Process and Complexity<\/h3>\n<p data-start=\"9932\" data-end=\"10057\">The more bends a part has, the smaller the bend radius, and the more complex the geometry, the longer the manufacturing time.<\/p>\n<p data-start=\"10059\" data-end=\"10308\">A part that requires laser cutting, press brake bending, TIG welding, and hardware insertion will cost more than a simple flat laser-cut bracket. If special tooling or custom fixtures are required, those costs will also be included in the quotation.<\/p>\n<h3 data-section-id=\"f063uf\" data-start=\"10310\" data-end=\"10331\">Surface Treatment<\/h3>\n<p data-start=\"10333\" data-end=\"10393\">Different surface treatments have different cost structures.<\/p>\n<p data-start=\"10395\" data-end=\"10595\">Powder coating is often priced by surface area. Anodizing may be affected by immersion time and process requirements. Electroplating may be priced by weight or surface area, depending on the supplier.<\/p>\n<p data-start=\"10597\" data-end=\"10694\">Masking requirements, which prevent certain surfaces from being coated, also increase labor cost.<\/p>\n<h3 data-section-id=\"mj4lcz\" data-start=\"10696\" data-end=\"10722\">Tolerance Requirements<\/h3>\n<p data-start=\"10724\" data-end=\"10843\">Parts with general tolerances, such as <strong data-start=\"10763\" data-end=\"10788\">\u00b10.5 mm or ISO 2768-m<\/strong>, are usually easier and less expensive to manufacture.<\/p>\n<p data-start=\"10845\" data-end=\"11049\">When critical dimensions require <strong data-start=\"10878\" data-end=\"10900\">\u00b10.1 mm or tighter<\/strong>, suppliers may need to reduce cutting speed, add secondary machining, use dedicated fixtures, or perform 100% inspection. These steps increase cost.<\/p>\n<h3 data-section-id=\"1twu2i7\" data-start=\"11051\" data-end=\"11078\">Quantity and Batch Size<\/h3>\n<p data-start=\"11080\" data-end=\"11301\">The unit price for 5 prototype parts may be <strong data-start=\"11124\" data-end=\"11145\">3\u201310 times higher<\/strong> than the unit price for 5,000 production parts. This is because programming, setup, equipment preparation, and tooling costs are spread across fewer parts.<\/p>\n<div id=\"attachment_3679\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-3679\" class=\"wp-image-3679 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-800x450.webp\" alt=\"Bar chart showing how sheet metal unit price decreases as production quantity increases from prototype to mass production\" width=\"800\" height=\"450\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-5.webp 1672w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3679\" class=\"wp-caption-text\"><span style=\"color: #808080;\">Sheet metal unit prices drop significantly as production volume increases, because setup time, programming, and tooling costs are amortized across more parts. Including quantity breaks in an RFQ helps suppliers provide optimized pricing at each level.<\/span><\/p><\/div>\n<p data-start=\"11303\" data-end=\"11466\">Including multiple quantity breaks in the RFQ, such as <strong data-start=\"11358\" data-end=\"11393\">10 \/ 100 \/ 1,000 \/ 5,000 pieces<\/strong>, allows suppliers to provide optimized pricing at each production level.<\/p>\n<h3 data-section-id=\"i2mr4j\" data-start=\"11468\" data-end=\"11494\">Lead Time Requirements<\/h3>\n<p data-start=\"11496\" data-end=\"11673\">Standard lead times allow suppliers to plan production efficiently. Urgent orders may require overtime, priority material purchasing, or air freight, all of which increase cost.<\/p>\n<p data-start=\"11675\" data-end=\"11761\">If your schedule is flexible, tell the supplier. Flexibility may help improve pricing.<\/p>\n<h2 data-section-id=\"hg06yl\" data-start=\"11768\" data-end=\"11822\">Why Is DFM Feedback Important During the RFQ Stage?<\/h2>\n<p data-start=\"11824\" data-end=\"11995\"><strong data-start=\"11824\" data-end=\"11831\">DFM<\/strong>, or <strong data-start=\"11836\" data-end=\"11868\">Design for Manufacturability<\/strong>, is the process of reviewing a design to determine whether it can be manufactured efficiently, reliably, and cost-effectively.<\/p>\n<p data-start=\"11997\" data-end=\"12225\">In simple terms, before a factory accepts an order and finalizes the quotation, it should check whether the part can be produced in a practical way and whether there are opportunities to reduce cost, time, or manufacturing risk.<\/p>\n<p data-start=\"12227\" data-end=\"12284\">Common DFM findings in sheet metal manufacturing include:<\/p>\n<ul data-start=\"12286\" data-end=\"12650\">\n<li data-section-id=\"4nl72n\" data-start=\"12286\" data-end=\"12333\">Bend sequences that are physically impossible<\/li>\n<li data-section-id=\"1nacj4l\" data-start=\"12334\" data-end=\"12383\">Flanges that are too short for existing tooling<\/li>\n<li data-section-id=\"98yxaf\" data-start=\"12384\" data-end=\"12452\">Holes located too close to bend lines, which may cause deformation<\/li>\n<li data-section-id=\"9ger81\" data-start=\"12453\" data-end=\"12513\">Welds that can be eliminated by changing the part geometry<\/li>\n<li data-section-id=\"1506jac\" data-start=\"12514\" data-end=\"12579\">Tight tolerances that are not necessary for the part\u2019s function<\/li>\n<li data-section-id=\"1qmyb5w\" data-start=\"12580\" data-end=\"12650\">Surface finish requirements that conflict with the selected material<\/li>\n<\/ul>\n<p data-start=\"12652\" data-end=\"12866\">When suppliers provide <a href=\"https:\/\/ceshi.baoxuanmetal.com\/meaning-and-application-of-process-flow-in-sheet-metal-manufacturing\/\">DFM feedback during the sheet metal process flow<\/a>, buyers can often obtain a better manufacturing solution during the quotation stage.At the same time, suppliers can reduce production risks and avoid unnecessary problems later.<\/p>\n<div id=\"attachment_3681\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-3681\" class=\"wp-image-3681 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-800x450.webp\" alt=\"Before and after comparison of a sheet metal bracket design showing how DFM feedback reduced welds and simplified the bend sequence\" width=\"800\" height=\"450\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-7.webp 1672w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3681\" class=\"wp-caption-text\"><span style=\"color: #808080;\">DFM feedback during the RFQ stage can simplify part geometry, reduce the number of welds, and lower production cost \u2014 without changing the part&#8217;s function. In this example, a four-piece welded bracket was redesigned as a single bent part.<\/span><\/p><\/div>\n<p data-start=\"12868\" data-end=\"13002\">In many cases, <strong data-start=\"12883\" data-end=\"13001\">strong DFM feedback during the RFQ stage can increase the buyer\u2019s confidence and help the supplier win the project<\/strong>.<\/p>\n<h2 data-section-id=\"1qiym0m\" data-start=\"13009\" data-end=\"13067\">How to Compare Sheet Metal Quotations Beyond Unit Price<\/h2>\n<p data-start=\"13069\" data-end=\"13219\">When selecting a supplier, buyers should not focus only on the lowest unit price. The full cost of the entire purchasing process should be considered.<\/p>\n<div id=\"attachment_3682\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-3682\" class=\"wp-image-3682 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-800x450.webp\" alt=\"Printed sheet metal quotation comparison checklist with three supplier columns and multiple cost factor rows, partially filled in by hand\" width=\"800\" height=\"450\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-8.webp 1672w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3682\" class=\"wp-caption-text\"><span style=\"color: #808080;\">Comparing sheet metal quotations requires looking beyond unit price. A structured comparison checklist covering tooling, surface treatment, inspection, packaging, shipping, and payment terms helps buyers evaluate total cost of ownership.<\/span><\/p><\/div>\n<p data-start=\"13221\" data-end=\"13268\">A complete quotation comparison should include:<\/p>\n<ol data-start=\"13270\" data-end=\"13785\">\n<li data-section-id=\"1j4avfo\" data-start=\"13270\" data-end=\"13315\"><strong data-start=\"13273\" data-end=\"13315\">Prototype or sample manufacturing cost<\/strong><\/li>\n<li data-section-id=\"181gyt6\" data-start=\"13316\" data-end=\"13363\">Tooling, programming, fixture, or setup fees<\/li>\n<li data-section-id=\"1j0ilqn\" data-start=\"13364\" data-end=\"13418\">Surface treatment and other secondary process costs<\/li>\n<li data-section-id=\"1og3k8u\" data-start=\"13419\" data-end=\"13453\">Hidden quality inspection costs<\/li>\n<li data-section-id=\"smrak\" data-start=\"13454\" data-end=\"13491\">Packaging and transportation costs<\/li>\n<li data-section-id=\"dwl493\" data-start=\"13492\" data-end=\"13549\">Payment terms, deposit requirements, and payment cycle<\/li>\n<li data-section-id=\"16oc2gz\" data-start=\"13550\" data-end=\"13605\"><a href=\"https:\/\/ceshi.baoxuanmetal.com\/factory-tour\/\">Supplier stability and long-term manufacturing capability<\/a> should also be considered when comparing sheet metal quotations.<\/li>\n<li data-section-id=\"l7wobw\" data-start=\"13606\" data-end=\"13658\">DFM support and engineering communication quality<\/li>\n<li data-section-id=\"bq2cd5\" data-start=\"13659\" data-end=\"13737\">Documentation support, such as inspection reports and material certificates<\/li>\n<li data-section-id=\"k0mydw\" data-start=\"13738\" data-end=\"13785\">Risk of rework, delay, or quality rejection<\/li>\n<\/ol>\n<p data-start=\"13787\" data-end=\"13905\">Only by considering these visible and hidden costs can buyers understand the true cost of sourcing a sheet metal part.<\/p>\n<p data-start=\"13907\" data-end=\"14011\">Choosing the lowest unit price without reviewing the full cost structure may lead to higher costs later.<\/p>\n<h2 data-section-id=\"1ip2to9\" data-start=\"14018\" data-end=\"14067\">Common Mistakes in the Sheet Metal RFQ Process<\/h2>\n<h3 data-section-id=\"887rag\" data-start=\"14069\" data-end=\"14103\">Common Mistakes Made by Buyers<\/h3>\n<div id=\"attachment_3674\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-3674\" class=\"wp-image-3674 size-fusion-800\" src=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-800x450.webp\" alt=\"Comparison of an informal smartphone photo versus a proper dimensioned engineering drawing for a sheet metal RFQ\" width=\"800\" height=\"450\" srcset=\"https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-200x113.webp 200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-300x169.webp 300w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-400x225.webp 400w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-500x281.webp 500w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-600x338.webp 600w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-700x394.webp 700w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-768x432.webp 768w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-800x450.webp 800w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-1024x576.webp 1024w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-1200x675.webp 1200w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10-1536x864.webp 1536w, https:\/\/ceshi.baoxuanmetal.com\/wp-content\/uploads\/2026\/05\/RFQ-10.webp 1672w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-3674\" class=\"wp-caption-text\"><span style=\"color: #808080;\">One of the most common buyer mistakes is sending a photo instead of a dimensioned drawing. A photo cannot convey accurate dimensions, tolerances, material specifications, or surface finish requirements \u2014 all of which are essential for an accurate quotation.<\/span><\/p><\/div>\n<ol data-start=\"14105\" data-end=\"14978\">\n<li data-section-id=\"egwfsv\" data-start=\"14105\" data-end=\"14273\"><strong data-start=\"14108\" data-end=\"14158\">Sending photos instead of dimensioned drawings<\/strong><br data-start=\"14158\" data-end=\"14161\" \/>A photo cannot replace a technical drawing with accurate dimensions, tolerances, and material specifications.<\/li>\n<li data-section-id=\"vvlgbd\" data-start=\"14275\" data-end=\"14449\"><strong data-start=\"14278\" data-end=\"14315\">Using vague material descriptions<\/strong><br data-start=\"14315\" data-end=\"14318\" \/>Terms such as \u201csteel\u201d or \u201ciron\u201d are not specific enough. Buyers should provide the exact material grade and applicable standard.<\/li>\n<li data-section-id=\"1syh2wp\" data-start=\"14451\" data-end=\"14624\"><strong data-start=\"14454\" data-end=\"14514\">Not defining tolerances and cosmetic acceptance criteria<\/strong><br data-start=\"14514\" data-end=\"14517\" \/>Without clear tolerance and appearance requirements, suppliers may quote based on different assumptions.<\/li>\n<li data-section-id=\"ck0bhw\" data-start=\"14626\" data-end=\"14830\"><strong data-start=\"14629\" data-end=\"14698\">Providing unclear quantities or unrealistic delivery requirements<\/strong><br data-start=\"14698\" data-end=\"14701\" \/>If the purchase quantity and delivery schedule are not clear, suppliers may be unable to quote accurately or accept the order.<\/li>\n<li data-section-id=\"1ua7dvi\" data-start=\"14832\" data-end=\"14978\"><strong data-start=\"14835\" data-end=\"14882\">Failing to provide the latest file revision<\/strong><br data-start=\"14882\" data-end=\"14885\" \/>Outdated drawings, BOMs, or CAD files can lead to incorrect pricing and production errors.<\/li>\n<\/ol>\n<h3 data-section-id=\"12goz39\" data-start=\"14980\" data-end=\"15017\">Common Mistakes Made by Suppliers<\/h3>\n<ol data-start=\"15019\" data-end=\"15695\">\n<li data-section-id=\"1qi6mxx\" data-start=\"15019\" data-end=\"15154\"><strong data-start=\"15022\" data-end=\"15084\">Quoting immediately without confirming the drawing details<\/strong><br data-start=\"15084\" data-end=\"15087\" \/>Suppliers should review unclear items before submitting a price.<\/li>\n<li data-section-id=\"1dnupzo\" data-start=\"15156\" data-end=\"15329\"><strong data-start=\"15159\" data-end=\"15197\">Forgetting secondary process costs<\/strong><br data-start=\"15197\" data-end=\"15200\" \/>Surface treatments such as electroplating, powder coating, anodizing, or passivation should not be omitted from the quotation.<\/li>\n<li data-section-id=\"1d3gl0t\" data-start=\"15331\" data-end=\"15495\"><strong data-start=\"15334\" data-end=\"15393\">Not clarifying ambiguous RFQ information before quoting<\/strong><br data-start=\"15393\" data-end=\"15396\" \/>Unclear materials, tolerances, finish requirements, or assembly scope should be confirmed first.<\/li>\n<li data-section-id=\"14rv1la\" data-start=\"15497\" data-end=\"15695\"><strong data-start=\"15500\" data-end=\"15539\">Providing an unclear cost breakdown<\/strong><br data-start=\"15539\" data-end=\"15542\" \/>If the quotation does not separate unit price, tooling cost, surface treatment, packaging, and shipping, later cost disputes are more likely to occur.<\/li>\n<\/ol>\n<h2 data-section-id=\"1hryhf7\" data-start=\"15702\" data-end=\"15708\">FAQ<\/h2>\n<p data-start=\"17929\" data-end=\"18087\" data-is-last-node=\"\" data-is-only-node=\"\"><div class=\"accordian fusion-accordian\" style=\"--awb-border-size:1px;--awb-icon-size:16px;--awb-content-font-size:var(--awb-typography4-font-size);--awb-icon-alignment:left;--awb-hover-color:var(--awb-color2);--awb-border-color:var(--awb-color3);--awb-background-color:var(--awb-color1);--awb-divider-color:var(--awb-color3);--awb-divider-hover-color:var(--awb-color3);--awb-icon-color:var(--awb-color1);--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);--awb-icon-box-color:var(--awb-color8);--awb-toggle-hover-accent-color:var(--awb-color5);--awb-title-font-family:var(--awb-typography1-font-family);--awb-title-font-weight:var(--awb-typography1-font-weight);--awb-title-font-style:var(--awb-typography1-font-style);--awb-title-font-size:16px;--awb-title-letter-spacing:var(--awb-typography1-letter-spacing);--awb-title-line-height:var(--awb-typography1-line-height);--awb-content-font-family:var(--awb-typography4-font-family);--awb-content-font-weight:var(--awb-typography4-font-weight);--awb-content-font-style:var(--awb-typography4-font-style);\"><div class=\"panel-group fusion-toggle-icon-boxed\" id=\"accordion-3671-1\"><div class=\"fusion-panel panel-default panel-83d442cc65329ba54 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_83d442cc65329ba54\"><a aria-expanded=\"false\" aria-controls=\"83d442cc65329ba54\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-3671-1\" data-target=\"#83d442cc65329ba54\" href=\"#83d442cc65329ba54\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">Is an RFQ the same as a price inquiry?<\/span><\/a><\/h4><\/div><div id=\"83d442cc65329ba54\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_83d442cc65329ba54\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p data-start=\"15754\" data-end=\"16029\">Not exactly. A casual price inquiry may simply be an email asking for a rough price. An <strong data-start=\"15842\" data-end=\"15897\">RFQ is a structured and formal procurement document<\/strong> that usually includes drawings, material specifications, quantities, tolerances, surface finish requirements, and commercial terms.<\/p>\n<p data-start=\"16031\" data-end=\"16109\">The accuracy of the quotation is much higher when the RFQ package is complete.<\/p>\n<p data-start=\"17929\" data-end=\"18087\" data-is-last-node=\"\" data-is-only-node=\"\"><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-2e487857ab48ad4f0 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_2e487857ab48ad4f0\"><a aria-expanded=\"false\" aria-controls=\"2e487857ab48ad4f0\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-3671-1\" data-target=\"#2e487857ab48ad4f0\" href=\"#2e487857ab48ad4f0\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">How many suppliers should receive a sheet metal RFQ?<\/span><\/a><\/h4><\/div><div id=\"2e487857ab48ad4f0\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_2e487857ab48ad4f0\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p data-start=\"16169\" data-end=\"16214\">A common recommendation is <strong data-start=\"16196\" data-end=\"16213\">3\u20135 suppliers<\/strong>.<\/p>\n<p data-start=\"16216\" data-end=\"16417\">If too few suppliers are invited, the buyer may not receive competitive pricing. If too many suppliers are invited, some suppliers may assume their chance of winning is low and may not quote carefully.<\/p>\n<p data-start=\"16419\" data-end=\"16538\">For long-term projects, buyers may first invite <strong data-start=\"16467\" data-end=\"16484\">5\u20138 suppliers<\/strong>, then narrow the list down to <strong data-start=\"16515\" data-end=\"16537\">2\u20133 core suppliers<\/strong>.<\/p>\n<p data-start=\"17929\" data-end=\"18087\" data-is-last-node=\"\" data-is-only-node=\"\"><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-9f370d6eb1f44385b fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_9f370d6eb1f44385b\"><a aria-expanded=\"false\" aria-controls=\"9f370d6eb1f44385b\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-3671-1\" data-target=\"#9f370d6eb1f44385b\" href=\"#9f370d6eb1f44385b\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">Can the buyer change the design after receiving quotations?<\/span><\/a><\/h4><\/div><div id=\"9f370d6eb1f44385b\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_9f370d6eb1f44385b\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p data-start=\"16605\" data-end=\"16797\">Yes, but design changes may require suppliers to re-quote the project, especially if the changes affect material, thickness, bending method, welding, surface finish, or tolerance requirements.<\/p>\n<p data-start=\"16799\" data-end=\"16958\">The later the design change happens, the greater the cost impact may be. This is why <strong data-start=\"16884\" data-end=\"16957\">DFM review should be completed during the RFQ stage whenever possible<\/strong>.<\/p>\n<p data-start=\"17929\" data-end=\"18087\" data-is-last-node=\"\" data-is-only-node=\"\"><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-31df9fe92cb192da6 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_31df9fe92cb192da6\"><a aria-expanded=\"false\" aria-controls=\"31df9fe92cb192da6\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-3671-1\" data-target=\"#31df9fe92cb192da6\" href=\"#31df9fe92cb192da6\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">What does it mean if two suppliers give very different prices?<\/span><\/a><\/h4><\/div><div id=\"31df9fe92cb192da6\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_31df9fe92cb192da6\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p data-start=\"17028\" data-end=\"17221\">First, check whether both suppliers quoted based on the same RFQ package. Confirm that the drawing revision, material standard, quantity, surface finish, and quality requirements are identical.<\/p>\n<p data-start=\"17223\" data-end=\"17321\">If the RFQ information is the same but the price gap is still large, possible reasons may include:<\/p>\n<ul data-start=\"17323\" data-end=\"17501\">\n<li data-section-id=\"ne4toh\" data-start=\"17323\" data-end=\"17356\">Different manufacturing methods<\/li>\n<li data-section-id=\"1mrnja0\" data-start=\"17357\" data-end=\"17391\">Different equipment and capacity<\/li>\n<li data-section-id=\"4ojjxu\" data-start=\"17392\" data-end=\"17425\">Different labor cost structures<\/li>\n<li data-section-id=\"1dsljqe\" data-start=\"17426\" data-end=\"17455\">Different profit strategies<\/li>\n<li data-section-id=\"1ezho1h\" data-start=\"17456\" data-end=\"17501\">One supplier missing a process or cost item<\/li>\n<\/ul>\n<p data-start=\"17503\" data-end=\"17599\">Do not choose the lowest price immediately. First, identify the reason for the price difference.<\/p>\n<p data-start=\"17929\" data-end=\"18087\" data-is-last-node=\"\" data-is-only-node=\"\"><\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-9673b6118a0dca1d8 fusion-toggle-has-divider\" style=\"--awb-title-color:var(--awb-color8);--awb-content-color:var(--awb-color8);\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_9673b6118a0dca1d8\"><a aria-expanded=\"false\" aria-controls=\"9673b6118a0dca1d8\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-3671-1\" data-target=\"#9673b6118a0dca1d8\" href=\"#9673b6118a0dca1d8\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">How long is an RFQ quotation usually valid?<\/span><\/a><\/h4><\/div><div id=\"9673b6118a0dca1d8\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_9673b6118a0dca1d8\"><div class=\"panel-body toggle-content fusion-clearfix\"><\/p>\n<p data-start=\"17650\" data-end=\"17771\">Most sheet metal suppliers provide quotations valid for <strong data-start=\"17706\" data-end=\"17720\">15\u201330 days<\/strong>, mainly because raw material prices can fluctuate.<\/p>\n<p data-start=\"17773\" data-end=\"17927\">Stainless steel and aluminum prices may change quickly. After the quotation validity period expires, suppliers usually need to recalculate material costs.<\/p>\n<p data-start=\"17929\" data-end=\"18087\" data-is-last-node=\"\" data-is-only-node=\"\">For projects with a long decision cycle, buyers should either confirm the order within the validity period or negotiate price-locking terms with the supplier.<\/p>\n<p data-start=\"17929\" data-end=\"18087\" data-is-last-node=\"\" data-is-only-node=\"\"><\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Note: In some industries, especially construction and government services, RFQ  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":3675,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[126],"tags":[],"class_list":["post-3671","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-quoting-and-procurement-terms"],"acf":[],"_links":{"self":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/posts\/3671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/comments?post=3671"}],"version-history":[{"count":4,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/posts\/3671\/revisions"}],"predecessor-version":[{"id":4459,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/posts\/3671\/revisions\/4459"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/media\/3675"}],"wp:attachment":[{"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/media?parent=3671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/categories?post=3671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ceshi.baoxuanmetal.com\/wp-json\/wp\/v2\/tags?post=3671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}